Debre Tabor University፡ Procurement of ICT Equipment – test3.diretenders.com

Debre Tabor University፡ Procurement of ICT Equipment


Government (Jun 29, 2026)

Please click on this Link in order to Bid on the Electronic Government Procurement website

https://production.egp.gov.et/egp/bids/report/tendering/6a71bb8a-3d2a-42a0-9769-95c3069557c6/open

Reference Number: DTU-NCB-G-0042-2018-BID-Open
Lot Reference: DTU-NCB-G-011-2018-BID

Procurement Information

  • Procurement Type: Bidding
  • Procurement Method: Open
  • Market Type: National
  • Envelope Type: two envelopes
  • Category: Goods

Procuring Entity

Organization: Debre Tabor University

Contact Information

Address: South Gondar, Debre Tabor

Town: Debre Tabor

Country: Ethiopia

P.O. Box: 272

Post Code: 6300

Telephone: +251 966822100

Email: worku1606@gmail.com

Office: 4th Floor

Important Dates

  • Invitation Date: Jun 28, 2026, 12:00 AM
  • Submission Deadline: Jul 23, 2026, 2:00 PM
  • Opening Schedule: Jul 23, 2026, 2:30 PM
  • Clarification Deadline: Jul 10, 2026, 5:00 PM

Eligibility Requirements

Bid Security: 2000000 ETB

Joint Venture: Required

Bid Security Forms (Local): CPO, Bank_Guarantee

Bid Security Forms (SME): CPO, Letter_from_Small_and_Micro_Enterprise, Bank_Guarantee

Bid Security Forms (Foreign): Bank/Wire Transfer

Qualification Requirements

  • Nationality

    Nationality in accordance with ITB Clause 4.2.

    Reference: 4.2

  • Conflict of Interest

    No conflict of interest as described in ITB Clause 6.

    Reference: 6

  • Valid trade license or business organization registration certificate

    Having submitted a valid trade license or business organization registration certificate issued by the country of establishment in accordance with ITB Clause 4.6

    Reference: 4.6

  • VAT registration certificate

    Having submitted a VAT registration certificate issued by the tax authority (in case of contract value of Birr 100,000.00 and above) in accordance with ITB Clause 4.6.

    Reference: 4.6.

  • Valid tax clearance certificate

    Having submitted a valid tax clearance certificate issued by the tax authority (Domestic Bidders Only) in accordance with ITB Clause 4.6

    Reference: 4.6

  • Personnel for the key positions

    Among the staff mentioned in the Sub-Clause, Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements

    Reference: 37.3 (c)

  • Form Data on Joint Ventures

    In the case of a bid submitted by a joint venture (JV), the Bidder has to submit the Form Data on Joint Ventures, the Agreement governing the formation of the joint venture, or a letter of intent to form a JV, including a draft agreement, in accordance with ITB Clause 4.1

    Reference: 4.1

  • Origin of the Goods and Related Services offered: The 

    Bidder has to provide in the Bid Submission Sheet Form the Statement attesting to the origin of the Goods and Related Services offered

    Reference: 16

  • warranty offered

    The bidder has to submit a description of the organization of the warranty offered in accordance with the conditions laid down in GCC Clause 23

    Reference: 16.3

  • Annual Turnover

    The average annual turnover calculated as total certified payments received for contracts in progress or completed within the last three years must exceed times the amount of the financial proposal of the Bid;

    100 million or above.

    Reference: 15

  • Certificates of satisfactory execution of contracts

    The Contractor must provide in the Contractor Certification of Compliance Form information related to its professional qualification and capability for the current and the [insert number of years] previous five years in order to prove its professional capacity.

    Reference: 16.3

  • Manufacturer Authorization Letter

    Bidder has to submit the Manufacturer Authorization Letter in accordance with ITB Clause 5.6

    Tender Specific Manufacturer Authorization Form (MAF) must be submitted for all the proposed products and solutions. MAF and collaboration shall be subject to confirmation by the manufacturer.

    Reference: 5.6

  • Audit Report

    Submission of audited balance sheets and other financial statements as required in the BDS Clause 15.2(b), for the last three years, to demonstrate the current soundness of the Bidder’s financial position and its prospective long-term profitability

    Reference: 15.2(b),

  • Schedule of Requirements

    Bidder has to complete its Schedule of Requirements + Technical Offer + Compliance Sheet Form in accordance with the Terms of Reference presented as per the template in Section 6, Schedule of Requirements

    Reference: 12.18

  • Drawings and Performance Diagrams

    Bidder has to submit Drawings and Performance Diagrams – Form E of Section 6 (if applicable).

    Reference: 12.19

  • Number of staff

    Minimum of 5 technical engineers/experts, highly skilled and experienced in Networking Infrastructure system implementation 

    Reference: 37.3 (b)

  • Must Meet Criteria

     

    1. Site Survey – Mandatory
    2. Tender Specific Manufacturer Authorization Form (MAF) must be submitted for all the proposed products and solutions. MAF and collaboration shall be subject to confirmation by the manufacturer.- Mandatory
    3. Compliance Table, Data Sheet, and BoQ without Price in the technical Document should be presented.- Mandatory
    4. Local experts should be available for the Main Network Equipment (LAN switch /Router and /data center). – Mandatory
    5. The proposed Contractor/Brand should have stayed at least three years in the Gartner Magic Quadrant for Network products – Mandatory
    6. Availability of local projects with a similar size and scope: A Contractor or partner must have at least 1 similar case and will be visited by DTU staff- Mandatory
    7. Post-deployment executions 3-year warranty (replace or repair) and Support-3-years after acceptance – Mandatory

    Reference: ITB 12.15

  • major relevant contracts successfully completed 

    Bidder must attach the Contractor Certification of Compliance Form with information about major relevant contracts successfully completed in the course of the past 5 years.

    Reference: ITB 12.16

  • Technical Offer

    Bidder has to complete its Schedule of Requirements + Technical Offer + Compliance Sheet Form in accordance with the Terms of Reference presented as per the template in Section 6, Schedule of Requirements

    Reference: ITB 12.16

  • Bid Submission Sheet Form

    Bidder has to provide in the Bid Submission Sheet Form the Statement attesting to the origin of the Services offered

    Reference: ITB 12.17

  • Financial standing

    Financial standing of the company for the last three years

    Reference: 15

  • Bidder Certification of Compliance Form

    Bidder has to provide in the Bidder Certification of Compliance Form personnel statistics for the period specified in the BDS Clause 14.1 in order to proof its professional capacity;

    Reference: 12.12

  • Relevant professional certificates

    Bidder has to submit relevant professional practice certificates if required in BDS Clause 4.6(b)(iv)

    Reference: 12.13

  • Relevant professional certificates

    The bidder has to submit relevant professional practice certificates if required in BDS Clause 4.6(b)(iv);

    Reference: 12.11

Procurement Classification

  • 305000000: ICT Equipment

Source of Fund

  • Treasury

Governing Rule

The Federal Republic of Ethiopia

Terms and Conditions

1. The University has the right to cancel the bid fully or partially. (ዩኒቨርሲቲው ጨረታውን በከፊልም ሆነ ሙሉ በሙሉ የመሰረዝ መብት አለው።) 2. Bidders are required to provide CPO or a bank guarantee of 2,000,000 birr in person. (ተጫራቾች የጨረታ ማስከበሪያውን 2,000,000 ብር ሲፒኦ ወይም የባንክ ዋስትና በአካል ማቅረብ ይጠበቅባቸዋል፡፡) 3. Bidders must submit their Private Key number before to the bid opening date. (አቅራቢዎች የጨረታ መለያ ቁጥራቸውን ከጨረታ መክፈቻው ቀን ቀድመው መላክ አለባችው።) 4. It establishes a turnkey, end-to-end delivery model, ensuring that all systems are fully operational, integrated, and aligned with international standards and DTU’s operational requirements. the bidder will be responsible for the entire project from start to finish. Therefore, the competing organizations should study the existing infrastructure of the university and submit the project. (ይህ ጨረታ የተርንኪይ ግዥ ጨረታ በመሆኑ ተጫራቹ ሙሉ በሙሉ ከመጀመሪያው እስከ መጨረሻው ሰርቶ የሚያስረክብ መሆኑ ታስቦ ተወዳዳሪ ድርጅቶች አሁን ለይ ያለውን የዩኒቨርሲቲውን መሰረተ ልማት በማጥናት ሰርተው ማስረከብ ይኖርባቸዋል፡፡) 5. the Eligible Countries participate on this Bid presented China and Ethiopia is misconfigured and as it is a National Bid, So only Ethiopia is Eligible. (ጨረታ ላይ የሚወዳደሩ ፈቃድ ያላቸው ሃገሮች ቻይና እና ኢትዮጵያ ተብሎ የወጣው በስህተት ሲሆን ጨረታው ብሔራዊ ስለሆነ መወዳደር የሚችል ሃገር ኢትዮጵያ ብቻ ተብሎ የተስተካከለ መሆኑ እንዲታወቅ)

Bidding Logistics

Site Visit: Allowed


Leave a Reply

Your email address will not be published. Required fields are marked *