TULU KAPI GOLD MINE SHARE COMPANY (TKGM) Invites Eligible Bidders for the Quotation (TKGM-RFQ-2026-Fuel Tank Installation-001) to solicit firm technical and commercial proposals from qualified heavy transport, electro-mechanical, and fuel infrastructure contractors for the turnkey end-to-end scope of loading, haulage, and installation of 4 pieces of 50,000-Liter (50 m3) single-wall Above ground Storage Tanks (AST) – test3.diretenders.com

TULU KAPI GOLD MINE SHARE COMPANY (TKGM) Invites Eligible Bidders for the Quotation (TKGM-RFQ-2026-Fuel Tank Installation-001) to solicit firm technical and commercial proposals from qualified heavy transport, electro-mechanical, and fuel infrastructure contractors for the turnkey end-to-end scope of loading, haulage, and installation of 4 pieces of 50,000-Liter (50 m3) single-wall Above ground Storage Tanks (AST)


2merkato.com (Aug 21, 2026)

TULU KAPI GOLD MINE SHARE COMPANY (TKGM)
MINING OPERATIONS & SITE INFRASTRUCTURE ENGINEERING

REQUEST FOR QUOTATION (RFQ) – REVISION 2
EX-WORKS LOADING, HEAVY TRANSPORT, INSTALLATION OF 4 x 50,000L ABOVEGROUND
STORAGE TANK (AST) FUEL SYSTEM

Document Reference: TKGM-RFQ-2026-Fuel Tank Installation-001
Project Title: Ex-Works Factory Loading (Addis Ababa), Heavy
Logistics Transport to West Welega (Tulu Kapi
Mine) Tank Placement, Piping & Electrical Installation

Issuing Entity: Tulu Kapi Gold Mine Share Company (TKGM)
Issuing Date: August 20, 2026
Submission Deadline: September 04, 2026

1. Project Objective & Expanded Scope of Works

Tulu Kapi Gold Mine Share Company (TKGM) is issuing this Request for Quotation (TKGM-RFQ-2026-Fuel Tank Installation-001) to solicit firm technical and commercial proposals from qualified heavy transport, electro-mechanical, and fuel infrastructure contractors for the turnkey end-to-end scope of loading, haulage, and installation of 4 pieces of 50,000-Liter (50 m3) single-wall Above ground Storage Tanks (AST).

The scope encompasses complete Ex-Works crane loading at the manufacturer’s plant in Addis Ababa, route survey and secure low-bed heavy transport to West Welega (Tulu Kapi Gold Mine Site), offloading, crane rigging and tank placement, fuel delivery/suction/vent piping networks for all 4 units, dispenser pump integration, automated tank gauging monitoring automation, electrical grounding/explosion-proof wiring, and final commissioning compliant with ES 7022:2023.

2. Contractor Technical, Logistics & Health, Safety & Environment (HSE) Requirements

• Ex-Works Factory Crane Loading (Addis Ababa): Provision of suitable mobile crane and certified rigging personnel to load 4 manufactured 50k tanks onto heavy-duty low-bed transport trailers at the manufacturer’s yard in Addis Ababa, including proper wooden saddle cradles and tension tie-down lashing.

3. Bill of Quantities (BOQ) & Financial Response Template (Revised for 4 x AST)

Bidders must fill out unit rates and total amounts in Ethiopian Birr (ETB) for each item in the BOQ matrix 

4. Installation Contractor Submission Guidelines

  • Technical Submission: Provide structural methodology statement for aboveground bund installations, transport vehicle details (low-bed capacities, transit insurance), crane lifting plan, safety plan, key personnel CVs, and detailed project schedule (Gantt chart).
  • Commercial Submission: Fill out all unit rates and total amounts in Section 3 (BOQ) above in Ethiopian Birr (ETB), ensuring Ex-Works loading and long-haul transport rates for all 4 tanks are explicitly stated.
  • Mandatory Credentials: Valid Ethiopian Construction/Electro-Mechanical Trade License (GC/RC/EMC Grade 5 or above), VAT Registration, Tax Clearance Certificate, and relevant past bulk fuel facility project references.

5. Submission Instructions

All formal inquiries, technical clarifications, and final proposals must be submitted on and before September 04, 2026, 05:00 pm to:

TULU KAPI GOLD MINE PLC — COMMERCIAL DEPARTMENT
Attention: Commercial Manager, TKGM
Organization: Tulu Kapi Gold Mine PLC
Email: Procurment@tulukapi.com 
Phone: +251-97-000-4227
Address: Tulu Kapi Gold Mine SC, Platinum Plaza, 13th Floor, Addis Ababa, Ethiopia.

TKGM reserves the right, at its sole discretion, to accept or reject any bid, to cancel or annul the tender process at any time before contract award and shall not be liable to any bidder for any costs, losses, or damages incurred as a result
thereof.