Your cart is currently empty!
The Ethiopian Engineering Corporation Construction Business Sector (here in after referred to as “the Buyer”) invites/requests (here in after referred to as “Suppliers”) to respond to this expression of interest invitation for its upcoming construction projects for the supply (here in after referred to as “the Materials, Goods and Related services”)
Addis Zemen(Oct 27, 2025)
ከስር የተቀመጠውን እያንዳንዱን መረጃ በጥንቃቄ ያንብቡ። Please read the detailed instructions below.
Ethiopian Engineering Corporation – Construction
Expression of Interest for the Supply of Construction Materials, Good and Related Services 
PART A: GENERAL
1. INTRODUCTION AND BACKGROUND
Our Company Ethiopian Engineering Corporation – Construction is Grade I general contractor engaged in the construction of medium and large-scale projects with high standard and quality. Which was formerly work under Ethiopia Construction Design & Supervision Works Corporation (E.C.D.S.W.CO) as Ethiopian engineering and investment group (EEIG), currently established as a separate entity to work on construction sector as Ethiopian Engineering Corporation-construction.
As part of Ethiopian Engineering Corporation-Construction, we pride ourselves on delivering exceptional quality, safety, and functionality in every project we undertake. Our Grade one construction company has been in operation for years, and we have a proven track record of delivering successful projects across Ethiopia. We specialize in delivering high-end and complex construction projects. Our expertise lies in constructing high-rise commercial and residential buildings, as well as infrastructure projects such as roads, railways, and airports. We are also involved in projects in the real estate, water, and energy sectors. With our extensive experience and knowledge in the industry, we are equipped to handle even the most challenging projects with skill and precision.
We are a fully government-owned Grade I contractor with full Design and Build capacity, operating under the Ethiopian Investment Holding.
Since its establishment in 2020 has been engaging in construction projects. For more information you can visit our website https://www.eeigconstruction.com
Further more as part of its commitment, the construction business sector has considered it par amount the need to adapt a more proactive and collaborative approach of modern procurement applications through identification and utilization of reliable supply chains, early supplier engagement, creating a competitive business environment with an aim to achieve win-win outcomes for both buyer and seller by working with prequalified & approved suppliers to gain a steady grow thin reputation and market share.
With this in mind, the construction business sector seeks to on-board suitable construction and construction related materials and goods & related service Suppliers to respond to this expression of interest invitation for its upcoming building and infrastructure.
Project Scope
The Ethiopian Engineering Corporation -Construction Business Sector (here in after referred to as “the Buyer”) invites/requests (here in after referred to as “Suppliers”) to respond to this expression of interest invitation for its upcoming construction projects for the supply (here in after referred to as “the Materials, Goods and Related services”).
The upcoming projects includes a variety of construction and construction related materials, goods and related services categorized as per the below.
| # 
 | Main Supply Category ‘A’ | # 
 | Sub-Categories | |
| A 
 | Office Machines, Stationery Materials and Consumables 
 | 1.1 | Stationery Materials | |
| 1.2 | IT Equipment, Accessories and Relevant Services and Appliances 
 | Desktops, Laptops, Tablets, Cameras & Accessories | ||
| Office Machines | ||||
| Electronic Appliances | ||||
| Communication & Security System Equipment Supply & Installation Service | ||||
| IT Infrastructure Supply and Installation Service | ||||
| Licensed Software | ||||
| 1.3 | Other Supply and Service Consumables | Security Service | ||
| Cleaning Service | ||||
Table 1:- Table of main supply category ‘A’
| # 
 | Main Supply Category ‘B’ | # 
 | Sub-Categories | |
| 
 
 
 
 
 B 
 | 
 
 
 
 
 Direct Construction Material Inputs 
 | 2.1 | Concrete 
 | Ready-Mix Suppliers | 
| Course Aggregate & Fine Aggregate (Gravel & Sand) | ||||
| Cement (PPC/OPC) | ||||
| Pre-Cast | ||||
| 2.2 | Reinforcement Bar 
 | Different Diameter Sizes Ribbed, Plain, Coated) | ||
| 2.3 | Formwork 
 | Formwork for Slab | ||
| Formwork for Wall | ||||
| Formwork for Column | ||||
| 2.4 | Scaffolding 
 | Caps-Lock Scaffolding | ||
| Suspended Scaffolding | ||||
| 2.5 | Water Proofing 
 | Sub-Structure Water-Proofing | ||
| Wet Area Water-Proofing | ||||
| Roof Water-Proofing | ||||
| 2.6 | Backfilling Materials 
 | Natural Select Fill | ||
| Natural Granular | ||||
| Crushed Stone | ||||
| 2.7 | Concrete Repairing Material | |||
| 2.8 | Safety Materials | |||
| 2.9 | Road Construction Materials 
 
 
 
 | Borrow Material | ||
| Capping Material | ||||
| Sub-Base Material | ||||
| Base Course | ||||
| Asphalt Material | ||||
Table 2:- List of Direct Construction Material
| 
 
 
 
 
 
 
 
 
 
 
 
 C | Main Supply Category ‘C’ | # 
 | Sub-Categories | |
| 
 
 
 Finishing Construction Material Input Supply 
 | 3.1 | Block 
 | Hollow-Block | |
| Solid Block | ||||
| Insulated Block & Thermal Block | ||||
| 3.2 | Plastering 
 | Ready-Mix Plastering | ||
| Site Mix (Cement, Sand) | ||||
| Accessories (Corner Bead, Mesh and Ties) | ||||
| 3.3 | Dry Wall/False Ceiling 
 | Gypsum Board | ||
| Jointing and Taping | ||||
| Accessories | ||||
| 3.4 | Wall, Floor& Ceiling Finish 
 | Ceramic | ||
| Porcelain | ||||
| Marble | ||||
| Granite | ||||
| Window Blind | ||||
| Curtain | ||||
| Carpet Tile | ||||
| Parque | ||||
| PVC Tile | ||||
| Epoxy Coating | ||||
| Timber Cladding | ||||
| Wall Paper | ||||
| 3.5 
 
 | Joinery 
 | Solid Wood | ||
| MDF (Medium Density Fiber Board) | ||||
| HDF (High Density Fiber Board) | ||||
| MFC (Melamine Faced Chipboard) | ||||
| Particle Board | ||||
| PlyWood | ||||
| Veneer | ||||
| Laminate | ||||
| 3.6 | Glazing 
 | Float Glass | ||
| Tempered Glass | ||||
| Anneled Glass | ||||
| Laminated Glass | ||||
| Double-Glazing | ||||
| 
 3.7 
 
 | 
 Metal 
 | Aluminum Profile & Aluminum Panel | ||
| Mild-Steel | ||||
| Stainless Steel | ||||
| 3.8 | Chemical Solutions 
 | Tile, Adhesive and Grout | ||
| Admixtures | ||||
| Waterproofing | ||||
Table 3: List of Finishing Construction Mate
| 
 | Main Supply Category ‘D’ | # 
 | Sub-Categories | ||
| D | Mechanical, Electrical and Plumbing (MEP) Equipment and Accessory Supply 
 | 4.1 | Mechanical 
 | AC System 
 | Indoor Units | 
| Outdoor Units | |||||
| Terminal Units | |||||
| Ventilation System 
 | Duct | ||||
| Fans | |||||
| Terminal Units | |||||
| Chilled Water System 
 | Pumps | ||||
| Pressurization units | |||||
| Air Handling Equipment | |||||
| Close Control Air Conditioning Unit | |||||
| Fan Coil Units | |||||
| DX Split units | |||||
| Compressed Air | Compressor | ||||
| 
 | 
 
 
 
 4.2 
 | 
 
 
 
 Electrical 
 | Medium Voltage (MV) 
 | High Tension Cables (HT Cables) | 
 | 
| Ring Main Unit (RMU) | 
 | ||||
| Transformer | 
 | ||||
| Low Voltage(LV) 
 | LV Switch gear, Breakers, Bus bars, Isolators & Disconnecting switches | ||||
| LV conductors & cables | |||||
| Grounding, earthing & lightning protection | |||||
| Metallic & Non-Metallic conduits & Accessories | |||||
| Cable trays/Ladder/trunking & accessories | |||||
| Capacitor Banks (Power factor correction equipment) | |||||
| 
 | Stand by Generator, UPS, Automatic Transfer switches 
 | ||||
| Indoor & outdoor Light fittings & Lighting control system | |||||
| Solar Power Generation System | Fire Alarm Cables | ||||
| 
 | Fire Alarm Input & Output Modules | ||||
| 
 | Control Panel | ||||
| ICT & Communication IPIV System 
 
 
 | IT cabling | ||||
| IPPBX | |||||
| Networking | |||||
| Servers & Desktops | |||||
| Security Access Control Systems | Video surveillance equipment | ||||
| Building Management System | 
 | ||||
Table 4:- List of mechanical, electrical and plumbing (MEP)
| # 
 | Main Supply Category ‘E’ | # 
 | Sub-Categories | |
| 
 
 
 E 
 | 
 
 
 Specialty Works 
 | 5.1 | Shoring Work | |
| 5.2 | Piling Work | |||
| 5.5 | Waterproofing Work | |||
| 5.12 | Landscaping Work | |||
| 5.14 | Logo, Signage and Way Finding | |||
| 5.15 | Kitchen Equipment Supply and Installation | |||
| 5.16 | Supply and Installation of Office Furniture and Equipment | |||
| 5.18 | HVAC (Heating, Ventilation & Air Conditioning) Works | |||
| 5.19 | Plumbing Work | |||
| 5.20 | Metal and Glazing Work | Steel | ||
| Aluminum | ||||
| 5.21 | Electrical and Electro-Mechanical Works | |||
| 5.22 | Interior Design 
 | Gypsum-Dry wall Partition, False Ceiling etc. | ||
| Joinery Work-Door, Window etc. | ||||
| Floor Finish-Ceramic, Marble etc. | ||||
| Paint-Wall & Ceiling | ||||
| 5.23 | Asphalt Paving | |||
Table 5:Listof Specialty Contractors
| # 
 | Main Supply Category ‘F’ | # 
 | Sub-Categories | |
| 
 
 
 
 ‘F’ 
 | 
 
 
 
 Supply of Vehicles, Construction Machinery, Plant and Equipment 
 | 6.1 | Mid/Light Duty Vehicles 
 | Single Cabin Pick-up | 
| Double Cabin Pick-up | ||||
| MidiBus | ||||
| Mini-Bus | ||||
| Medium Sized Trucks | ||||
| 6.2 
 | Earth Moving Machineries/Heavy Machinery 
 | Dozer | ||
| Excavator | ||||
| Loader | ||||
| Back Hoe Loader | ||||
| Grader | ||||
| Roller Compactor | ||||
| 6.3 | Heavy Duty Trucks 
 | Dump Truck | ||
| Low/High-Bed Truck | ||||
| Water Truck | ||||
| Fuel Truck | ||||
| Mobile Mixer Truck | ||||
| Crane-Truck Mounted | ||||
| Mobile Crane | ||||
| 6.4 | Trailers 
 | Low-Bed Trailer | ||
| High-Bed Trailer | ||||
| Fuel Tank Trailer | ||||
| Water Tank Trailer | ||||
| 6.5 | Plants 
 | Crusher Plant | ||
| Concrete Batching Plant | ||||
| Asphalt Plant | ||||
| 
 6.7 | 
 Auxiliary Equipment 
 
 
 
 
 
 | Generators | ||
| Compressors | ||||
| Forklift | ||||
| Water Pump | ||||
| Mixer Truck | ||||
| Jack-Hammer | ||||
| Concrete Vibrator | ||||
| Road Marking Machine | ||||
| 
 6.9 
 
 
 
 | 
 Workshop Tools 
 | Tool Box & Special Tools | ||
| Grinder | ||||
| Bench Vise | ||||
| Hydraulic Lift Jack | ||||
| Mechanical Jack | ||||
| Chain Hoist | ||||
| 6.10 | Workshop Machines | Bar Cutting/Bending | ||
| 
 | 
 | Machine | ||
| 
 | Welding Machine | |||
| 
 | Drilling Machine | |||
| 6.11 | Spare Parts for Vehicles, Machineries, Plants, Tools and Equipment | |||
Table 6:List of Direct Construction Materials Inputs
| # 
 | Main Supply Category ‘G’ | # 
 | Sub-Categories | 
 | 
 | 
| 
 
 
 
 
 
 
 G | 
 
 
 
 
 
 Transportation, Shipping and Logistics Services 
 | 
 
 
 
 
 
 7.1 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 7.2 
 | 
 
 
 
 
 
 Various Transportation and Construction Machineries, Plants, Tools and Equipment Services 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 | Mid/Light Duty Vehicles 
 | Single Cabin Pick-up | 
| Double Cabin Pick-up | |||||
| Midi Bus | |||||
| Mini-Bus | |||||
| Medium Sized Trucks | |||||
| Earth Moving Machines/ Heavy Machinery 
 | Dozer | ||||
| Excavator | |||||
| Loader | |||||
| Back Hoe Loader | |||||
| Grader | |||||
| Roller Compactor | |||||
| Dry and Liquid Transport Services 
 | Dump Truck | ||||
| Low/High-Bed Truck with Trailer | |||||
| Water Truck | |||||
| Fuel Truck | |||||
| Mixer/Mobile Mixer Truck | |||||
| Crane-Truck Mounted | |||||
| Mobile Crane | |||||
| Trailer 
 | Fuel Tank Trailer | ||||
| Water Tank Trailer | |||||
| Plants | Crusher Plant | ||||
| Concrete Batching Plant | |||||
| Asphalt Plant | |||||
| Asphalt Machines 
 | Paver | ||||
| Asphalt Ketel | |||||
| Tandem Roller | |||||
| Pneumatic Roller | |||||
| 
 
 Auxiliary Equipment 
 
 
 | Generators | ||||
| Compressors | |||||
| Forklift | |||||
| Water Pump | |||||
| Asphalt Cutter | |||||
| Road Marking Machine | |||||
| Shippeing Logistic Services | Freight Forwarding Services | ||||
| Customs Clearing Services | |||||
| 7.3 
 | Modular Building Supply and Services | Site Modular Housing Materials and Related Services | |||
| 7.4 | Fuel and Lubricants | Fuel Supply Services | |||
| Fuel Dispenser Supply | |||||
| Lubricants Supply Services | |||||
Table 7:List of Transportation, Shipping and Logistics Services Supply
| # 
 | Main Supply Category ‘H’ | # 
 | Subcategories | 
| 
 | Professional (Legal and External Audit Services) | 8.1 | Professional (Legal and External Audit Services) | 
Table 8-List of Legal and external Audit Services
| # 
 | Main Supply Category I | # 
 | Sub-Catagories | 
| 1 
 | Consultancy Services (Building & Infrastructure related) 
 | 9.1 | Design Consultant | 
| 9.2 | MEP Consultant | ||
| 9.3 | Health and Safety Consultant | ||
| 9.4 | Environmental Consultant | 
Table 9 List of Consultancy Services
| # 
 | Main Supply Category ‘J | # 
 | Sub-Categories | 
| J | Events and Promotional Materials Supply and Services 
 | 10.1 | Graphics Design and Promotional Materials Supply Services | 
| 10.2 | Event Materials and Equipment Suppliers (for Supply/Rent) | ||
| 10.3 | Event Organizing & Catering Services | 
Table 10:Events & Promotional Materials Supply and Services
| # | Main Supply Category ‘K’ | # | Sub-Categories | 
| K | Cleaning, Security and Manpower Services 
 | 11.1 | Cleaning Services | 
| 11.2 | Security and Manpower Services | 
Table 11: Cleaning, Security and Manpower Services
Project Period
Successful suppliers who have passed the first stage of this REOI shall be eligible to participate in upcoming tender for up to a period of 12 months. Interested suppliers shall cover all costs associated with the preparation and submission of the required information to EEC-Construction Business Sector, here in after referred to, as The Buyer. Interested suppliers are solely responsible for all expenses associated with responding to this REOI.
Important information and dates:
| REOINO#4 | 
 | 
| Name of the Work | |
| Last date for submission of queries | 
 | 
| Last date of query response | 
 | 
| Last date & Time Of submission of EOI | January 15,2026 GC | 
| Address for communication/submission of EOI | In-front of Former Imperial Hotel Addis Ababa Website: | 
| Contact person | Procurement Department, +251-902-286-250, +251-911-792-953,+251-942-585-209,+251-911-133-875 | 
PART B: QUALIFICATION
1. General Information About the Supplier
| Supplier’s/Contracture’s Legal Name: | 
 | 
| Legal Address in Country of Registration: | Address: Telephone/Fax: E-mail address: Website | 
| Incase of Joint Venture, legal name of each party: | 
 | 
| Incase of Joint Venture. Place of Registration for Each Party 
 | Address: Telephone/ Fax: E-mail address: Website | 
| Authorized Representative Information 
 | Name: Position: Address: Telephone/ Fax: E-mail address: | 
| 
 Attached copies of original documents of: 
 
 
 | In case of JV, letter of intent to form JV including a draft agreement, or agreement governing formation of JV | 
| Form Data on Joint Ventures | 
2. Professional, Technical, and Financial Qualifications
2.1 Legal and Professional Qualifications
| Factor | Requirement 
 | Criteria 
 | Documentation Required | 
| Nationality 
 | All suppliers shall have as their country of origin an eligible country. A country can be eligible when it is not under the re- striction list of the Government of Ethiopia. | Must meet requirement 
 | EOI Submission Sheet 
 | 
| Registration in the FPPPAA’s Suppliers List 
 | Having been registered in the Public Procurement and Prop- erty Administration Agency’s Suppliers List | Must meet requirement 
 | Attach FPPPAA Supplier’s Registration Certificate | 
| Not Debarred by decision of the FPPPAA 
 | Not having been debarred by decision of the Public Procure- ment Agency from participating in public procurements for breach of its obligation under previous contracts | Must meet requirement 
 | EOI Submission Sheet 
 | 
| Valid trade license or business organization registration certificate 
 | Having been submitted valid trade license or Business orga- nization registration certificate issued by the country of establishment | Must meet requirement 
 | Attach Renewed Trade license and/or commercial registration Certificate | 
| VAT registration certificate 
 | Having been submitted VAT registration certificate issued by the tax authority | Must meet requirement 
 | Attach VAT Registration Certificate | 
| Valid tax clearance certificate 
 | Having been submitted valid tax clearance certificate issued by the tax authority (Domestic Suppliers Only) | Must meet requirement 
 | Attach Valid tax clearance certificate 
 | 
| Company Profile 
 | Having been submitted company profile | Must meet requirement 
 | Attach company profile | 
| Original Manufactures Product Catalogue | Having been submitted | Optional requirement 
 | Attach Original Manufac tures Product Catalogue | 
2.2 Technical Qualifications, Competence, and Experience in the Procurement Object
As proof of the technical and professional ability in selling, installing and servicing the Good sand Related Services listed in our invitation for EOI the tables below summarize the major relevant contracts successfully completed in the course of the past years with a budget of each partner of a Joint Venture should separately provide details of its own relevant contracts.
| 1 | Name of Supplier | 
 | 
| 2 | Name of Contract/ Project | 
 | 
| 
 | Country | 
 | 
| 3 | Name of client | 
 | 
| Address of client | ||
| Name of contact person | ||
| Function of contact person | ||
| Telephone number | ||
| E-mail address | ||
| 4. | Nature of Goods and Related Services relevant to the contract for which the Bidding Documents are issued | 
 | 
| 5. | Contract role (check one) 
 | Prime Contractor: Subcontractor; Partner in a Joint Venture | 
| 6. | Overall supply value in (Insert currency) | 
 | 
| 7. | Date of award/completion | 
 | 
| 8. | Final acceptance issued (check one) | Yes: Not Yet No: 
 | 
| 9 | Number of staffs provided | 
 | 
| 10 
 
 
 | Indicate the approximate percent of total contract value of Works, Goods and Related Services undertaken by subcontract, if any, and the nature of such Non-Consultancy services | 
 | 
| 11 | Other relevant information | 
The Client’s Certificate concerning the satisfactory execution of contract is attached to this document
Name:
In the capacity of:
Signed:
Duly authorized to sign the EOI for and on behalf of:____
Dated on[ ] day of [ ]
2.3 Professional Qualifications and Capabilities
In order to proof our professional qualifications and capability the following table contains (insert supplier name)[ ]personnel statistics for the current and the two previous years.
| Average manpower 
 | Year before last | Last year | This year | |||
| Overall 
 | Specialists in Technical Area | Overall 
 | Specialists in Technical Area | Overall 
 | Specialists in Technical Area | |
| Permanent 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Temporary 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| TOTAL 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
2.4. Organization of Firm
Suppliers should explain how its firm is organized, for example, regionally or by technical practice and how it plans to manage the work included in this invitation document in addition to its other.
2.5 Quality Assurance/Managerial and Control Procedures.
Suppliers shall provide list of technical departments which will be involved in managing the contract, type of control procedures in place to accommodate the Contract, and details of the quality assurance system(s) proposed to use to ensure successful completion of the Contract.
| Item 
 | List of technical department/personnel 
 | Quality Assurance and Quality Control Procedure | Certification (Management System Certificate, Product Certificate, Third Party Test Report) | 
| 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
2.6 Equipment and Facilities
Suppliers should state whether it has necessary physical facilities and equipment to carry out the Contract and describe its technical and research facilities and measures used for ensuring quality
| Item | Description | Qty | Brand/Make | Model | 
| 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
1. Financial Standing
[ ]Supplier has adequate financial resources to manage did Contracts as established by our financial statements, audited by an independent auditor, submitted in this EOI.
The following table contains our financial data. These data are based on our annual audited accounts. Figures in all columns have been provided on the same basis to allow a direct, year-on-year comparison to be made.
| FINANCIAL DATA 
 | Historic Information for Previous Years in | ||||
| Year 2 
 | Year 1 
 | Last Year 
 | Current Year | Average 
 | |
| A. Information from Balance Sheet | |||||
| 1.Total Assets 
 | 
 | 
 | 
 | 
 | 
 | 
| 2. Total Liabilities 
 | 
 | 
 | 
 | 
 | 
 | 
| 1. Net Value (1-2) 
 | 
 | 
 | 
 | 
 | 
 | 
| 3. Current Assets 
 | 
 | 
 | 
 | 
 | 
 | 
| 4, Short-term debts 
 | 
 | 
 | 
 | 
 | 
 | 
| II. Working Capital (3-4) 
 | 
 | 
 | 
 | 
 | 
 | 
| B. Information from Income Statement 
 | |||||
| 1. Total Revenue 
 | 
 | 
 | 
 | 
 | 
 | 
| 2. Pre-tax Profits 
 | 
 | 
 | 
 | 
 | 
 | 
| 3. Losses 
 | 
 | 
 | 
 | 
 | 
 | 
3.1 Supplier Audit Agency
Suppliers should provide detail information of Auditors.
Name____________________
Address__________________
Phone___________________
Legal document (must be attached)!!
Along with financial data we provided above we have attached the following documents as proof of our financial standing, as required in the EOI: Attached documents comply with the following conditions:
3.1.1 Documents reflect the financial situation of the Bidder or partner to a Joint Venture, and not sister or parent companies;
3.1.2 istoric financial statements are audited by a certified accountant;
3.1.3 Historic financial statements are complete, including all notes to the financial statements;
3.1.4 Historic financial statements correspond to accounting periods already completed and audited.
| Annual Turnover Data 
 | |
| Year 
 | Amount and Currency 
 | 
| 
 | 
 | 
| 
 | 
 | 
| 
 | 
 | 
| 
 | 
 | 
| Average Annual Turnover* 
 | 
 | 
Name:__________
In the capacity of:__________
Signed:__________
Duly authorized to sign the EOI for and on behalf of:
Date don[ ] day of [ ],2025
Attachments:
1. Renewed Trade license and/or commercial registration Certificate
2. VAT Registration Certificate
3. Valid tax clearance certificate
4. Valid professional license, if applicable
5. Company profile
6. Original Manufactures Product Catalogue,
7. Audited financial statements
8. Documents required as proof of the supplier’s/contracture’s financial standing,
9. Certificatesofsatisfactoryexecutionofcontractsprovidedbycontractingpartiestothecontracts successfully completed
in the course of the past.
10. List of Company Equipment and Facilities
11. Third Party System Certificate’s (Management System certificate’s) or Third-Party Test Report, if any
Ethiopian Engineering Corporation Construction